Cable protection pipe construction
Permissible construction depths and deformation calculations
-
Select usage:
For construction in an open trench -
Select product:
EVOCAB SUPERHARD N 1250
EVOCAB FLEX
EVOCAB HARD
RIGID MULTI PP N 750
EVOCAB SPLIT N 450
EVOCAB SPLIT N 750
EVOCAB SPLIT N 1250 PANZAR
-
Select parameters:
-
Calculate:
Incorrect values or formulaWhen constructing pipes BELOW ground water level
Total vertical load on the pipe after constructionThe theoretical deformation of internal diameter of the pipe must not exceed the 5% limit (in accordance with the requirements specified in EN 61386-24)When constructing pipes ABOVE ground water level
Total vertical load on the pipe after constructionThe theoretical deformation of internal diameter of the pipe must not exceed the 5% limit (in accordance with the requirements specified in EN 61386-24)Virs vai zem gruntsudens līmeņa
Roadway construction
The calculations made and the results provided are informative. They may help you choose the appropriate solutions or products to be used if the user has an understanding of the specific calculation principles. The results of these tools and related information do not replace recommendations from a competent and professional specialist in the field and cannot be extended to products from other manufacturers. EVOPIPES reserves the right to restore and change the content of the information at any time without prior notice, as well as to make improvements and changes to the operation of calculators.